White Papers
Technical papers and guides from the companies that publish here, free to download.
554 white papers
There are many reciprocating pump manufacturers and within them, there are several different pump models. To make the ordering process more efficient, use this simple checklist to ensure that you get the exact parts you need from the component manufacturer. Download this simple checklist today.

In the late 1950s, while Jim Vaughan and his son Larry worked in their repair shop helping local dairy farmers fix clogging manure systems, they came up with a plan to solve the problem entirely – the development of the original Vaughan Chopper Pump. Today, the invention has multiple patents and is known worldwide in all industries as the pump of choice for RELIABILITY in heavy solids pumping. Learn about Vaughan Chopper Pumps in Dairy applications.

Over time wear and tear can reduce the accuracy of all test and calibration equipment. It can also be impacted by contamination, environmental exposure, and damage. At Druck, we have decades of experience in the calibration and repair of measurement devices. Ensuring minimum downtime and maximum confidence in your equipment. Druck calibration provides assurance in the accuracy of your measurement equipment, giving peace of mind and process control.

Route to Market (RTM) In Flowserve context, the RTM is via the wide use of distributors in many parts of the world, and is especially true for the North American markets. For maximum sales opportunities, the brewery size is paramount, starting from 1 million+ barrels per year capacity (where only a small volume of sales can be expected) to a brewery generating more than 3 million barrels per year (where there is a potential for higher sales opportunities). For most project executions, the brewery is usually built by several installers (often known as EPC contractors), who will receive the project order directly from the brewery company’s plant owner. All equipment orders will be placed entirely by the contractors; thus, success at this stage will be helpful in laying out the foundations for the aftermarket (AM) business. Each of these contractors will normally have their own equipment-approved vendor list (AVL) or preferred suppliers with whom they could choose to work. As such, it is absolutely critical and strategically important for us to have our products and services qualified upfront to get into this AVL, before the contractor can start placing any orders with us. For example, when working with Interbrew, a large Belgium-based brewing company which owned many internationally known and some smaller local beers, Flowserve SIHI® vacuum pumps are specified for their process vacuum application. However, we are not yet in their AVL for other processes using centrifugal or sanitary pumps.

When a bulk carrier experienced electrical erosion in the main auxiliary reduction gears that drive the ship’s 1.5 MW generator, power to the ship’s many electrical motors was lost. The motors operate a variety of pumps, conveying equipment, and ventilation equipment in onboard systems as well as unloading and loading conveyors. Without the generator, the ship would not have been able to leave port, much less transport bulk materials. The problem was discovered when, after an overhaul, the auxiliary reduction gears failed only 120 days out of port. The ship was forced to return to the Shanghai shipyard for repairs to the reduction gears. But, the shipping line soon realized that the damage to the gears was merely a symptom of larger problem — electrical arcing in the gearbox. The shipping line needed to find a permanent solution to this problem before the ship could leave port. And a cost of $10,000 per day for every day the ship remained in port, the shipping line needed to find a solution fast.

Smart actuators improve uptime and reduce costs Electric actuators have been used to control valves in demanding applications such as oil and gas, commercial power, and fresh water and wastewater processing since the 1980s. However, actuator and valve failures can compromise plant performance and employee safety. This can result in significant consequences for plant operators, including lost production and reduced profitability from downtime. This also can have an impact on the relationship and credibility of operators with their customers. In the water industry, equipment failure can cause contamination and create health risks for the general public, resulting in heavy fines and negative publicity for the operator. Thus, engineers designing plants and plant operators need actuators that can perform reliably and provide historical valve and actuator data for identifying maintenance requirements. To meet ever-increasing requirements for efficiency and cost reduction, operators also look for highly reliable actuators that not only control the flow of fluids and gases but help them avoid expensive, unplanned downtime. According to Baker Hughes, a mere 3.65 days of unplanned downtime a year can cost oil and gas companies approximately $5.037 million. To avoid that unplanned downtime and loss in revenue, operators need actuators with a variety of sensors, data collection and analytics capabilities — equipment enhanced with the intelligence to identify and report valve performance that’s outside of specified ranges. In addition, they want actuator hardware and software that alert technicians to mechanical issues before the valve or actuator breaks down and disrupts operations. Data enables plant operators to determine if they’re going to face equipment problems. That helps them to take corrective actions beforehand, so they don’t face plant downtime and incur production losses and repair costs. Smart actuators and diagnostic systems enable operators to understand process applications better and determine what’s running correctly (and what’s not) with specific equipment. The goal is to help business leaders make smarter long-term decisions for the benefit of their plants. Smart actuators provide them with more data in order to analyze operational trends and understand equipment performance over longer periods of time. In this white paper, you will learn more about how advanced actuators can: • Improve the reliability of equipment and processes • Simplify maintenance • Ensure accurate commissioning, setup and operation • Expand data collection and analyses of equipment condition and performance Previous generations of electric actuators were basically a motor to move a valve. Now, as the technology is growing, actuators are more than just the motor. They are critical for asset management. They’re becoming an integral part of the total system that provides feedback to alert operators about what’s exactly going on with the valve in the process.
Challenge At a leading Gulf state water company, 25% of circulation pumps in an odor control system were out of service for an extended period because the equipment manufacturer had discontinued production and spare parts became unavailable. Solution Flowserve proactively proposed restoring the full capacity of the odor control system by replacing the non-functioning circulation pumps with highly reliable INNOMAG® TB-MAG sealless thrust balanced process pumps. The company purchased six pumps. In addition, Flowserve is providing local aftermarket support (including guaranteeing sparts parts availability for 20 years) from a local Flowserve office and through a distributor in the country.

The Armstrong Design Assist service reduced the required floor space for hvac equipment. The ipc 11550, delivered as part of a packaged system, automates the output of the hvac system to maintain comfort and minimize energy usage. The Armstrong Design Assist service helps customers optimize the layout of mechanical rooms using space-saving solutions and innovative design. The Armstrong Integrated Plant Controller (ipc) 11550 is a chilled-water plant automation system designed to provide industry-leading energy efficiency as well as improved occupant comfort through all-variable-speed operation.

This condo tower (324 units on 13 floors) had completed a previous retrofit that unfortunately left the variable speed pumps operating in a fixed mode at low speed, so the hvac system couldn’t cool the west- facing units in the summer. Armstrong installed new Design Envelope pumps and used the Sensorless variable speed and auto-balancing capabilities to determine optimal flow rates. Operating in variable speed, demand-based mode, the pumps now provide 64% more flow but use 25% less power.

RAKWA is the RAK wastewater agency responsible for designing, building, operating, and maintaining all the public wastewater systems. Ras Al Khaimah—known as RAK—is the northernmost of the seven emirates in the United Arab Emirates (UAE). It has a population of about 350,000. It is known for its biodiversity with beaches and mountains. The new dedicated controls have “improved the efficiency in terms of the performance of the pump and the energy consumption. And it means the pumps are actually living longer, which is reducing the cost for maintenance, as well as the downtime of the assets,” says Walid Abdelrahman. RAKWA was challenged on several fronts and wanted to remedy them. Some of these were: Most maintenance activities were reaction-based, due to a lack of condition monitoring and data analysis-based system High repair costs Late response to system failures, causing sewage overflows, and customer dissatisfaction High energy consumption, due to the pumps’ fixed speed operating system High transportation and manpower cost of the physical monitoring system Difficulty in managing the network and pumping system in abnormal conditions e.g. foggy weather. “Given how young an organization we are, we’ve obviously had our teething problems,” says Abdul Qadir Malik, Head of Capital Project Delivery, RAKWA. “One of them was the poor execution of the way the systems were put in. It has resulted in our systems being misaligned, which has led to outside water infiltrating into our systems. This leads to higher electricity costs, higher operational costs, and this leads to a more strained tariff.” Because the system was operated manually, all 13 pumping and lifting stations had to be visited at least once every four hours, says Walid Abdelrahman, RAKWA’s O&M Department Manager. Something had to change.

Design Envelope 6800 boosters reduced energy consumption by 76% compared to previous boosters, resulting in annual cost savings of $4,400 per system. Background The Heron’s Hill office complex includes two A-class office buildings and a parking garage, offering businesses easy access major highways and to the amenities of North Toronto. The Heron’s Hill community team offers on-site support for businesses and organizes various activities to engage employees. The City of Toronto also has a strategic plan called Consumers Next for connecting North Toronto with Markham/Richmond Hill and Scarborough.

Our Solution Wireless sensors combined with a wireless battery-powered gateway can provide a flexible, safe, cost-effective, and reliable solution for collecting continuous condition monitoring data on rotating equipment where electric power is unavailable. The gateway transmits data collected to Hydro’s cloud-based Centaur Enterprise Predictive Maintenance (EPM) software, where end users can quickly assess the real-time status of equipment condition and access advanced tools for deeper diagnosis. The dedicated Centaur engineering team also accesses collected data through the EPM software to provide monitoring oversight, including monthly health reports, advanced analysis, and emergency support during detected alarm events.

