Pumps & OperationsGrease, fibrous materials, “flushables” and other solids continue to plague the operational efficiency of a traditional wet well.
Pumps & OperationsComprehensive product portfolio supports Reverse Osmosis plant needs As a leader in desalination, Flowserve seen the process commercialized on a large scale.
Fluid SealingAs we well know, workplaces and sites within the chemical industry are subject to strict regulations regarding safety and environmental requirements.
Oil & GasContributor: Dorota Zoldosova, Head of Marketing and Communications, Sulzer Chemtech Ltd. Innovative retrofit technology enhances existing upstream oil facilities Upstream systems for oil separation effectively delivered regulatory-compliant dehydrated crude oil…
Energy EfficiencyGlobal warming. Temperature increase. Political agendas. Enough said. Everybody is aware of the topic. But, what does global warming, and expected quality of life mean for an electrical engineer?
Pumps & OperationsConstruction of an auxiliary spillway began in 2008 at the Folsom Dam near Sacramento, CA.
Pumps & OperationsTo help facilitate remote HVAC management during these challenging times, Armstrong has announced that it will provide its cloud-based subscription service, Pump Manager, to new customers with three months of…
Pumps & OperationsThe proliferation of handy wipes, baby wipes, and other high-tensile strength fibrous materials that are marketed as “flushable” have caused major problems for wastewater treatment plants nationwide.
It’s so great to see peers nominate each other! Our Industry Person of the Week is Brittany Kelley, Design Engineer II with A.W. Chesterton Company.
Pumps & OperationsCaustic Soda (Sodium Hydroxide) is commonly used to adjust pH levels in water and wastewater treatment.
Pumps & OperationsWhen a pump goes down in wastewater applications a common misconception is that the pump is always the source of the problem.
Fluid SealingEGC has been making graphite pressure seals for 25 years for the US Navy but ten years ago, EGC developed a methodology that conformed to aftermarket power industry lead-time requirements.