For its line of uninterruptible power supply (UPS) systems a leading European designer and manufacturer of dynamic UPS systems needed a reliable clutch and coupling solutions.
Remote geothermal steam turbine inspection completed in record time Power generation sites provide one of the most important commodities, but this service can only be delivered if all of the…
Sulzer meets surging demand for boiler feed pumps in Argentina Over the past 18 months, Sulzer has delivered a record of 70 large-capacity boiler feed pumps to customers in Argentina.
Sulzer cooling water turnkey system for EDF’s most advanced CCGT power plant Opened in 2016, EDF Energy’s combined-cycle gas turbine (CCGT) power plant at Bouchain in Northern France has already…
Using pump data to predict downtime and identify engineered solutions For those in the energy industry, being able to identify pre-failure conditions and anomalous operation can offer a considerable advantage…
Rapid response gets electrical distribution powered up for holiday period Author: Alex Edwards, Marketing & Communications Manager, Rotating Equipment Services, Sulzer Keeping machinery operational is vital to maintaining productivity and…
Global warming. Temperature increase. Political agendas. Enough said. Everybody is aware of the topic. But, what does global warming, and expected quality of life mean for an electrical engineer?
The lip seal degradation on a large coal-fired power plant’s oil-lubricated holdbacks was experiencing problems. To prevent airborne contaminants from reaching internal seals and parts lip seals were designed.
When a massive turbine with a rotor diameter of more than 160 meters required new rotor breaks, the turbine OEM reached out to Stromag to inquire about a robust solution.