Considerations for Pump Station Design (Global Wastewater Challenges, Part 3)
In Part 3 of KSB’s article “Global Wastewater Challenges Place Pressure on Aging Infrastructure”, Horst Sturm shares a great amount of detail about wastewater pump stations and the design aspects that must be considered when addressing current wastewater challenges, such as change in sewage composition and clogging, etc. This article discusses the following aspects: Type of Station Pump Sump & Intake Design Sump Volume Inflow to the Sump Piping Diameter of the vertical discharge pipe Flow velocity Operating concepts
From KSB
Loading registration